068521
Page 25
SECTION 2
OPERATION
Introduction
This machine is built with user safety in mind. However, it can present
hazards if improperly operated and serviced. Follow operating instruc-
tions carefully. If you have any questions about operating or servic-
ing this equipment, please contact your Allen Engineering Dealer or
AEC Customer Service
at 800-643-0095 or 870-236-7751.
INTRODUCTION:
• The Walk-behind trowel is a modern high production machine. Finishing rates will vary
depending on the operator’s skill and job conditions. This trowel has four finishing
blades. Walk-behind trowels are designed for the floating and finishing of concrete slabs.
• The standard duty gearbox is designed to provide exceptional performance with low
maintenance and trouble-free use under some of the worst conditions. Power is trans-
ferred from the engine to the gearbox input shaft via a V-belt pulley drive system. The
pulley engages using a clutch, see the Parts Section (Section 4) of this manual for a
breakdown.
• All Allen Engineering Walk-behinds are equipped with
a safety shutdown switch.
• Operating time between fuel refills is approximately
2-1/2 to 3 hours with a rotor speeds of 110 to 135
RPM.
• The walk-behinds are the most technically advanced
riding trowels on the market today. With proper main-
tenance and use, your trowel will provide you with
exceptional service and dependability.
Summary of Contents for 068344
Page 5: ...068521 Page 5 GENERAL INFORMATION ...
Page 11: ...068521 Page 11 SECTION 1 SAFETY SECTION 1 SAFETY ...
Page 24: ...SECTION 2 OPERATION 068521 Page 24 SECTION 2 OPERATION ...
Page 29: ...068521 Page 29 SECTION 2 OPERATION PAGE LEFT BLANK INTENTIONALLY ...
Page 31: ...068521 Page 31 SECTION 2 OPERATION Trowel Controls 1 5 8 2 3 6 10 12 9 13 15 14 4 11 ...
Page 34: ...SECTION 3 SERVICE 068521 Page 34 SECTION 3 SERVICE ...
Page 39: ...068521 Page 39 SECTION 4 ACCESSORIES SECTION 4 ACCESSORIES ...
Page 40: ...SECTION 4 ACCESSORIES 068521 Page 40 Accessories ...