2-9
053423; 12/10
SECTION 2
OPERATIONS
2.3, continued
Operating Instructions
2.3.4
Pitch Adjustment
Different pitch angles are needed as you work the different stages of the concrete.
Refer to Figure 2.3.4 table below. When changing or setting pitch (angle of trowel
blades), slow the machine down, set the desired degree of pitch on the left side of the
machine and then adjust the right side to match.
To increase the pitch, turn the pitch control clockwise “
a
” use the pitch indicator “
b
” to
adjust pitch equally on both right and left trowel blades.
FIGURE 2.3.4
Pitch Adjustment
Summary of Contents for 053370
Page 1: ...OPERATIONS PARTS MANUAL MP315 Riding Trowel REVISION 07 2017 ...
Page 18: ...xvi 053423 12 10 INTENTIONALLY LEFT BLANK ...
Page 19: ...1 1 053423 12 10 SECTION 1 SAFETY Section 1 SAFETY ...
Page 34: ...1 16 SECTION 1 SAFETY 053423 12 10 ...
Page 35: ...2 1 053423 12 10 SECTION 2 OPERATIONS Section 2 OPERATIONS ...
Page 45: ...3 1 053423 12 10 SECTION 3 SERVICE Section 3 SERVICE ...
Page 64: ...3 20 SECTION 3 SERVICE 053423 12 10 Notes ...
Page 65: ...4 1 053423 12 10 SECTION 4 PARTS Section 4 PARTS ...
Page 82: ...4 18 SECTION 4 PARTS 053423 12 10 4 8 Electrical Schematic ...
Page 83: ...4 19 053423 12 10 SECTION 4 PARTS 4 8 Electrical Schematic cont d ...
Page 96: ...4 32 SECTION 4 PARTS 053423 12 10 4 16 Illustration Accessory Non standard Items 2 1 ...
Page 98: ...4 34 SECTION 4 PARTS 053423 12 10 4 17 Illustration Tools Service 1 2 ...
Page 101: ...4 37 053423 12 10 SECTION 4 PARTS Notes ...
Page 102: ...053423 12 10 INTENTIONALLY BLANK ...