
18
ProcessLogix Hardware
Publication 1757-5.1 - August 1999
4.
Write down the information that is displayed in the IP Address and Subnet
Mask fields. You will need this information later when you connect other
computers to your server.
IP Address:________________Subnet Mask:________________
Depending on changes you made to your configuration, you may need to reboot
your system. Shut down all applications before rebooting the system.
5.
To close the TCP/IP properties screen, click on Cancel.
6.
To close the network program, click Cancel.
7.
To close the Windows Control Panel, select File
⇒
Close.
Installing ControlNet Cabling
To install the ControlNet cabling for ControlNet communications, you will need:
•
two 1786-TPS or 1786-TPR droplines
•
two 1786-XT termination resistors
•
one 1786-BNCP cable