Rockwell Automation Publication 1757-UM012A-EN-P - July 2011
73
RSFieldbus Communication
Chapter
4
The Consolidate OPC Database dialog box appears.
This dialog box lets you do the following:
•
Add a project, see
.
•
Remove a project, see
.
•
Clear the project list, see
.
Add a Consolidated Project
Do these steps to add a project to the consolidated list.
1.
To add the project that is currently open, click Add This on the
Consolidate OPC Database dialog box.
A message dialog box appears to confirm that you are adding this project.
2.
Click Yes.
When Yes, the following configuration occurs:
–
Project name is added to the list of configurations and the
HseTagInfo_CONSOLIDATION.ini file is created in the OLE Server
folder.
–
The TagInfo.ini and HseTagInfo_CONSOLIDATION.ini files are
updated when you export tags.
If you need to change a tag in a project that already has been added to the
consolidated list, you must update the tag list. The Update This button
replaces Add This on the Consolidate OPC Database dialog box to let you
update the tag.
IMPORTANT
Only the project that is currently open can be added to the
consolidate list.
Summary of Contents for 1757-FFLD2
Page 8: ...8 Rockwell Automation Publication 1757 UM012A EN P July 2011 Table of Contents Notes...
Page 10: ...10 Rockwell Automation Publication 1757 UM012A EN P July 2011 Preface Notes...
Page 178: ...178 Rockwell Automation Publication 1757 UM012A EN P July 2011 Glossary Notes...
Page 182: ...182 Rockwell Automation Publication 1757 UM012A EN P July 2011 Index Notes...
Page 183: ......