Installation
Corner Operation - Corner Splash Shield
Machines are shipped from the factory for straight through operation. To convert to for
corner operation:
1.
The control panel must be accessible from the front as shown in Fig. 4.
2.
Install the optional splash shield, if equipped, see Fig. 5. Detailed instructions can be
found in Appendix A at the rear of this manual.
Fig. 4
Fig. 5
Control
Panel
NOTE:
TRACK CONVERSION INSTRUCTIONS ARE ON THE NEXT PAGE.
3