9
Installation
Scrap Screens
1. All models have scrap
screens in the top of the
wash tank.
Install four scrap screens in
the wash tank making sure
they fit securely without large
gaps between them.
2. The CH-66 and the MD-66
models have a prewash tank
containing a single large
scrap screen which extends
from front to back in the
prewash tank.
The prewash screen also
holds a refuse basket to
facillitate cleaning when
the machine is off.
Install the large scrap screen
making sure the screen fits
securely in the front and back
of the tank then install the
refuse basket as shown in
the illustration to the right.
Never remove the prewash
scrap screen while the dish-
washer is running.
All models have four scrap screens in the wash tank.
Model CH-66 and MD-66 has a scrap screen and refuse basket located in the
prewash tank.
Summary of Contents for Champion CH-44
Page 36: ...28 Blank Page This Page Intentionally Left Blank...
Page 38: ...Control Panel MD 44 MD 66 1 10 11 12 7 8 8 2 3 4 6 5 5 1 9 9 30...
Page 40: ...Control Panel CH 44 CH 66 I 44 I 66 1 2 3 4 6 5 5 1 10 8 7 9 32...
Page 44: ...Extended Vent Cowls All Models 1 5 7 6 8 2 3 4 9 10 MD44 MD66 CH44 CH66 I44 I66 36...
Page 50: ...Wash Tank Junction Box Terminal Block All Models 42 1 1 3 5 2 4 6 7...
Page 56: ...Final Rinse Piping All Models 3 5 4 4 5 2 1 6 7 48...
Page 58: ...Prewash Spray Arms CH 66 I 66 MD 66 1 2 4 3 5 7 8 8 12 6 9 10 11 13 Rear of Hood 14 50...
Page 64: ...Prewash Track Assembly CH 66 I 66 MD 66 11 1 4 15 13 14 12 18 17 16 19 10 8 1 3 4 2 7 5 6 9 56...
Page 66: ...1 15 2 3 16 4 5 15 17 7 6 8 9 10 7 14 13 12 11 11 13 7 Drive Motor Assembly All Models 58...
Page 70: ...Pump Motor Assembly All Models 3 2 1 62...
Page 72: ...Pump Installation CH 44 I 44 MD 44 10 11 13 12 16 3 4 6 1 15 14 2 7 5 9 5 Wash Tank 64...
Page 83: ...75 Blank Page This Page Intentionally Left Blank...
Page 84: ...Electric Booster Control Cabinet 27kW 70 F Rise 76 3 4 3 1 5 6 7 2 8 8 9 11 11 10 10 12 12...
Page 86: ...1 2 Dish racks All Models 78...
Page 88: ...Blank Page This Page Intentionally Left Blank 80...
Page 89: ...Rack Control Module Operation and Electrical Schematics 81...