ASDI
Installation, Operation and Maintenance Manual
– SECOND SUN – P/N 51856
TABLE of CONTENTS
Page
1. Introduction
1-3
Description
Figure 1
– SECOND SUN™ Dimensional Drawing
2. Installation
5-9
General Requirements
Tank Mounting Bands
Figure 2
– SECOND SUN™ Installation
High Pressure Tank Connection
Low Pressure Regulator Connection
Heater installation on to tank
Figure 3
– SECOND SUN™ Temperature Switches
Figure 4
– Adjustable Heater
Figure 5
– Gas Regulator Assembly
3. Operation
11-12
General Requirements
Operating Instructions
Starting Instructions
Stopping the Heater
4. Maintenance
13-14
General Requirements
Heater face and Tank surface Inspection
Gas Train Inspection
Terminal Strip
Temperature switch Band
Figure 6
–
Control Cover
5. Troubleshooting
15-19
General Requirements
Figure 7
–
Heater does not start
Figure 8
–
Heater does not come up to temperature after 30 minutes
Figure 9
–
Heater and pilot both turn off
Figure 10
–
Wiring Diagram