
Instruction Manual, Alfa Laval Toftejorg SaniJet 25
Standard machines, machines delivered with Q-Doc and/or ATEX certification, Dir. 94/9/EC
IM-TE91A760_EN12
Page 49
Disassembly of gear ring (bearing for body – Pos. 13.3)
Disassembly of gear ring (bearing for body – Pos. 13.3)
Tools need for disassembly
Standard toolkit
Ref. nr
Description
TE81B139
Drift
Hammer
1. Push out bearing for body (Pos. 13.3.) using the drift (TE81B139)
Summary of Contents for Toftejorg SaniJet 25
Page 2: ......