![ALENCON AID 1000 Installation, Operation And Maintenance Manual Download Page 15](http://html1.mh-extra.com/html/alencon/aid-1000/aid-1000_installation-operation-and-maintenance-manual_2893957015.webp)
Alencon SPOT: Installation,
Operation, and Maintenance Manual
14 |
P a g e
5.3 Connecting to Input and Output
1.
Connect PV Strings to appropriate PV IN Amphenol H4 connectors on the bottom of the
AID (see Figure 11).
F
IGURE
11:
B
OTTOM
V
IEW OF
AID,
I
NPUT
P
ORTS
2.
Connect PV wires from the AID to the corresponding SPOT/BOSS ports by following the
wire labels as shown in Figure 12 below.
F
IGURE
12:
PV
WIRES TO
SPOT/BOSS
I
NPUTS