12
Set-Up Sequence
12
DANGER
L1 – L2 : ________________________________
L1 – L3 : ________________________________
L2 – L3 : ________________________________
L1 – G : _________________________________
L2 – G : _________________________________
L3 – G : _________________________________
A maximum deviation of ± 5% is acceptable.
1- Check the voltage of the main circuit breaker (1 to 3 steps).
3- Manually put the device in the stop position using the
keyboard. See the provided user manual.
2- Activate the main disconnect switch.
300952 V1.0
This device contains high-voltage electrical components. All
maintenance must be done by a qualified technician to prevent
serious injury and possible death. Installation should be
completed in conformance with local building standards and
safety codes.
Tél. Can.: 1-800-262-0916 Usa.:1-800-255-7749
www.aldes.com