8 | Alderon Industries™ - Leading Edge Control Products
Cast Iron Cable Weight - USER GUIDE
Installing Float Switch Cable in Application Area
STEP 1: INSTALL AT DETERMINED ACTIVATION LEVEL
Suspend the float switch with cable weight at the determined
activation level using a mounted float bracket or per local codes.
STEP 2: WIRING
Wire the float switch per manufacturer’s instructions.
Testing
STEP 1: TESTING THE ACTIVATION LEVEL
Check the installation of the float switch by cycling the float on
and off to ensure proper system operation.
Activation Range
Activation Level
Deactivation Level
(narrow angle control switch, normally open example)
MOUNTED FLOAT BRACKET
Activation Level
(narrow angle control switch, normally open example)