![ALCOMEXINDO ALUSCAFF D1F-0114-02-MF Instructions Manual Download Page 17](http://html1.mh-extra.com/html/alcomexindo/aluscaff-d1f-0114-02-mf/aluscaff-d1f-0114-02-mf_instructions-manual_2892627017.webp)
Repair of scaffold material is only allowed after consultation with the manufacture or supplier.
16,CARE,MAINTENANCE AND STORAGE -1
Repair of scaffold material is only allowed after consultation with the manufacture or supplier.
Cleaning the mobile scaffold tower components
9
The scaffold tower system can be cleaned using water with a commercial cleaner added. Paint can be
removed
ATTENTION : Cleaning agents must not get into the ground, used cleaning fluids must be disposed of in
accordance with applicable environmental legislation.
Inspecting the mobile scaffold tower components
Frame (base frame/8 rung frame/ guardrail frame)
9
Inspect for deformation, crushing and cracks; if a deficiency is discovered, do not use the frame.
Braces (diagonal/horizontal)
Braces (diagonal/horizontal)
9
Inspect for deformation, crushing and cracks; if a deficiency is discovered, do not use the brace.
Platform
9
Inspect for deformation, crushing and cracks; if a deficiency is discovered, do not use the platform .
Check the hatch for ease of movement. Toe boards
9
Inspect the toe boards for check; if a deficiency is discovered, do not use the toe board. Castors
9
Check that the castors rotate and the brake is functioning.
PLEASE READ THIS INSTRUCTION CAREFULLY BEFORE USE
Copy Right 2012 – By Alcomexindo 021-8831036
(16)