ALCOMEXINDO ALUSCAFF D1F-0114-02-MF Instructions Manual Download Page 12

‰

Ballast is used at the base to stabilize towers against overturning. In circumstances where there is 

t i t d

d l

f

t bili

C

t

t

li

f

d i

It h ll b

l

11, SPECIAL SAFETY RULES - 4

restricted ground clearance for stabilizers. Contact your supplier for advice. It shall be securely 
positioned and made of rigid materials such as steel or concrete, but excluding liquids or granular 
materials (i.e.not water or loose sand). It shall not be positioned to overload individual legs. Ballast 
should be secured against accidental remove where practicable, and be supported on the lowest rung of 
the bottom frame.

‰

Remove all erection aids (e.g.system planking, 

Alcomexindo Aluminium Scaffolding

plank, etc) from 

the 

Alexindo Aluminium Scaffolding

not belonging to the model type.

‰

CAUTION after erection the

Alcomexindo Aluminium Scaffolding

can be moved to the proposed site

‰

CAUTION after erection, the 

Alcomexindo Aluminium Scaffolding

can be moved to the proposed site 

of use (ground gradient must not exceed 3%). Carry out the following work steps to move the scaffold 
tower system.

‰

To move the scaffold tower system, disengage the brake level and move the 

Alcomexindo Aluminium 

Scaffolding

the desired location, observing the “Safety Rules” in section 2

‰

After reaching the site : brake the castors by depressing the brake level, Adjust the castors, if 

required, until the mobile scaffold tower system is standing level and the castors have ground contact,

This mobile scaffold tower system shall be erected by at least 2 competent persons.

1. Insert the four adjustable legs into the vertical tubes of two base frame ( one of base frame has a U-
shape extension rung). Make the legs and vertical tube have a firm connection by fastening the V-shape 
bolt. Turn the assembled base unit upside down so that the wheels can contact ground. Lock the brakes 

f

(

ifi d i

)

on four castors. (see magnified view)

PLEASE READ THIS INSTRUCTION CAREFULLY BEFORE USE

Copy Right 2012 - By Alcomexindo 021-8831036

(11)

Summary of Contents for ALUSCAFF D1F-0114-02-MF

Page 1: ...DOUBLE WIDTH SINGLE WIDTH PLEASE READ THIS INSTRUCTION CAREFULLYBEFORE USE Copy Right 2012 By Alcomexindo 021 8831036 ALUMINIUM COMPANY EXTRUSION INDONESIA...

Page 2: ...S2F 0114 03 MF 1870 750 5380 D2F 0114 04 MF 1870 1350 5380 S3F 0114 05 MF 1870 750 7470 D3F 0114 06 MF 1870 1350 7470 S4F 0114 07 MF 1870 750 9550 D4F 0114 08 MF 1870 1350 9550 S5F 0114 09 MF 1870 75...

Page 3: ...ower frame with the opposite upper frames 2400 Brace opposite upper frames 3 Interlock clip To lock lower frames and upper frame clip frame 4 8 rung frame To increase the height of scaffolding 2080 x...

Page 4: ...otection of users at final level 930 x 750 8 Telescopic To increase stability of scaffolding 9 Adjustable To level scaffolding after moving or 9 Adjustable erection 10 Base Frame To consist base secti...

Page 5: ...4 SPECIFICATION PART ITEM PLEASE READ THIS INSTRUCTION CAREFULLY BEFORE USE Copy Right 2012 By Alcomexindo 021 8831036 4...

Page 6: ...vices to Alcomexindo Aluminium Scaffolding to lift loads Never use damaged or in correct components Brake all castors by pushing down the brake lever Only erect a Alcomexindo Aluminium Scaffolding on...

Page 7: ...do Aluminium Scaffolding onto other constructions When the wind force is 6 and above moves Alcomexindo Aluminium Scaffolding to a wind sheltered area or secure against tipping over by anchoring it Cli...

Page 8: ...7 SAFETY RULES SYMBOLS SAFETY PLEASE READ THIS INSTRUCTION CAREFULLY BEFORE USE Copy Right 2012 By Alcomexindo 021 8831036 7...

Page 9: ...especially power cables The ground shall be level hard and generally level enough level enough Alcomexindo Aluminium Scaffolding should only be moved by manual effort Do not move Alcomexindo Aluminiu...

Page 10: ...r second 25 m p h tie the tower to a rigid structure If the wind is likely to reach gale force over 18 meters per second 407 7m s 17 m p h m p h the tower should be dismantled tower should be dismantl...

Page 11: ...Al i i S ff ldi t d i d t b lift d d d l f t Alcomexindo Aluminium Scaffolding are not designed to be lifted or suspended please refer to your supplier for advice e Stabilizers Ballast Stabilizers sh...

Page 12: ...he Alcomexindo Aluminium Scaffolding can be moved to the proposed site of use ground gradient must not exceed 3 Carry out the following work steps to move the scaffold tower system To move the scaffol...

Page 13: ...on 1 Alcomexindo Aluminium Scaffolding can be erected as a centered erection 2 Horizontal and diagonal braces are fastened by means of snap locks which engage during erection and which are secured aga...

Page 14: ...the packaging material according to regulations Check that all parts of the Alcomexindo Aluminium Scaffolding are present according to section 5 Read the erection instruction WARNING never work from...

Page 15: ...ace onto the rungs of base section Then insert a 8 rung frame into the vertical tube of Then insert a 8 rung frame into the vertical tube of base section always make sure braces are fully locked in po...

Page 16: ...m Full Assy WARNING Never work from or build or dismantle the tower system an unguarded platform DISMANTLING NOTE the dismantling of the Alcomexindo Aluminium Scaffolding is in the reverse order of er...

Page 17: ...the mobile scaffold tower components Frame base frame 8 rung frame guardrail frame 9 Inspect for deformation crushing and cracks if a deficiency is discovered do not use the frame Braces diagonal hori...

Page 18: ...rage 9 The scaffold tower system components must be stored in such a way that they are not damaged 9 During Storage the scaffold tower components must be protected against the effects of weather Store...

Reviews: