Alcatel-Lucent 4080 IP-DECT
Installation Manual
8AL90850USAAed01
21
Figure 10. G.729 Daughter Board with sticky foam
6.
Mount the G.729 Daughter Board onto the main PWB. Push the Daughter Board
carefully onto the main board. The white connector should fit well. Make sure that
the sticky part sticks to the Main Board.
Figure 11. Mounting the G.729 Daughter Board onto the Main board.
Sticky foam