![ALBIN PUMP AD120 Instruction Manual Download Page 21](http://html1.mh-extra.com/html/albin-pump/ad120/ad120_instruction-manual_2889542021.webp)
21
AD
since 1928
AD
since 1928
4.2 - SUGGESTED PUMP INSTALLATION
Normal
Flooded
*
Submerged
4.3 - VENTING EXHAUST AIR
The air exhaust should be piped to an isolated container for safe disposal of the product being pumped, in the
event of a diaphragm failure. This also reduces the pump noise. As shown in the illustration a larger muffler
can be fitted to further reduce noise.
4.4 - BEFORE STARTING THE PUMP
Ensure that the suction pipes/hoses are free from debris. It is advised to run the pump with a compatible fluid
(e.g. water) prior to production start-up to ensure the system is correctly installed and there is no leakage.
*
Use fixed shaft at flooded installations
AD Instruction Manual-2011EE-GB.indd 21
25/07/11 09:46