OPERATION
PA8 & PA10 05/21
Operation Section 4-9
O
PE
R
AT
IO
N
© 2021 Alamo Group Inc.
8. PRE-OPERATION INSPECTION AND SERVICE
Before each use, a pre-operation inspection and service of the implement and tractor must be performed.
This includes routine maintenance and scheduled lubrication, inspecting that all safety devices are equipped
and functional, and performing needed repairs. DO NOT operate the unit if the pre-operation inspection
reveals any condition affecting safe operation. Perform repairs and replacement of damaged and missing
parts as soon as noticed. By performing a thorough pre-operation inspection and service, valuable down time
and repair cost can be avoided.
OPS-U-0029
Periodically inspect all moving parts for wear and replace when
necessary with authorized service parts. Look for loose fasteners, worn
or broken parts, and leaky or loose fittings. Make sure all pins have
cotter pins and washers. Serious injury may occur from not maintaining
this machine in good working order.
(SG-21)
8.1 Tractor Pre-Operation Inspection/Service
Refer to the tractor operator’s manual to ensure a
complete pre-operation inspection and scheduled
service is performed according to the
manufacturers recommendations. The following
are some of the items that require daily service and
inspection:
•
Tire condition/air pressure
•
Wheel lug bolts
•
Steering linkage
•
PTO shield
•
SMV sign is clean and visible
•
Tractor’s lights are clean and functional
•
Tractor Seat belt is in good condition
•
Tractor ROPS is in good condition
•
ROPS is in the raised position
•
No tractor oil leaks
•
Radiator free of debris
•
Engine oil level and condition
•
Engine coolant level and condition
•
Power brake fluid level
•
Power steering fluid level
•
Fuel condition and level
•
Sufficient lubrication at all lube points
•
Air filter condition
OPS-U-0030
Summary of Contents for Bush Hog PA10
Page 5: ...Safety Section 1 1 SAFETY SECTION ...
Page 17: ...SAFETY PA8 PA10 05 21 Safety Section 1 13 2021 Alamo Group Inc SAFETY Decal Description ...
Page 18: ...SAFETY PA8 PA10 05 21 Safety Section 1 14 2021 Alamo Group Inc SAFETY ...
Page 20: ......
Page 21: ...Introduction Section 2 1 INTRODUCTION SECTION ...
Page 26: ......
Page 27: ...Assembly Section 3 1 ASSEMBLY SECTION ...
Page 32: ......
Page 33: ...Operation Section 4 1 OPERATION SECTION ...
Page 55: ...Maintenance Section 5 1 MAINTENANCE SECTION ...
Page 60: ......
Page 62: ...PA8 PA10 SOM 05 21 P N 50074308 Printed U S A PA8 PA10 AERATOR ...