
40
4 Setting Up (Oxy2, Pressure transmitter and Dive Computer)
II Uwatec
®
Aladin
®
Air Z O
2
4.6 Pairing of pressure transmitter and dive computer
1. Shut the valve, purge the regulator and wait for
15 seconds.
2. Switch on the dive computer (contacts B and E)
and move it into the position shown below.
Pressure transmitter and dive computer must be in physical contact during all
the pairing procedure.
3. Open the tank valve. The transmitter briefly sends a pairing sequence to the
computer.
4. The dive computer shows a flashing <PAIr> in the display-position of tank
pressure shortly after the valve has been opened.
5. In order to confirm the pairing, the B- and E-contacts have to be bridged within
5 sec. A bleep confirms the input and the <PAIr>-display remains still. The com-
puter and pressure transmitter must remain in physical contact until the confir-
mation has been done.
6. Tank pressure is displayed after approximately 10 seconds.
7. In case of faulty pairing, the display <FAIL> appears instead of <PAIr>. In that
case, completely purge the regulator and repeat the pairing procedure. This is
only possible after at least 15 seconds.
tank data
tank data
tank data
bar
tank data
10 sec
Summary of Contents for ALADIN AIR Z O2
Page 72: ...72 III Uwatec Aladin Air Z O2...
Page 90: ...90 VI Uwatec Aladin Air Z O2...
Page 101: ...101 VIII Uwatec Aladin Air Z O2 English VIII...