AL-KO air heater / air cooler DESIGN
5. Assembly
Warning!
Installation, electrical connection, media supply connection, maintenance, commissioning, repair, etc. may only
be performed by trained staff.
The place of installation as well as the installation structure must provide permanent and vibration-free support of
the devices.
The place of installation and the installation structure must be checked by a structural engineer, if required.
AL-KO air heaters / air coolers are delivered in pre-assembled form.
The manufacturer documentation must be considered before installation or removal.
The air heaters / air coolers must be levelled during installation!
5.1
Ceiling installation of the devices
Mark the fastening points with the template provided in the packaging.
Drill fastening holes into the ceiling.
The installation distance between the device and the ceiling must be at least 80 mm. The factory mounts standard
brackets that ensure the minimum distance.
It must be ensured that there is sufficient space for the media connections!
Individually adjustable brackets (optional order) can be used to create larger distances or for adjustment.
Attach the air heater / air cooler to the ceiling.
Attach the media connections.
Fasten the hood with the fastening straps to the supporting part and then close and fasten it with the quick-release
clips.
1
Quick-release clip
2
Slot for fastening straps
Cooling
The maximum throwing distances apply for an air outlet temperature of 10 K below room temperature and ideal condi-
tions for the primary air stream.
Design size
Max. throwing distance
in m
ED-K1…
4.0
ED-K2…
10.0
ED-K3…
9.1