© 2016 AKW
9
15-010-048-01
Deflector Screen Instructions
Technical Help line
01905 560219
Measure the panel width
and drill through adjusting
slot hole at its longest
position.
Align the panel and screw
through adjusting slot
holes to temporarily hold
door in place.
Do not drill the secondary
holes just yet, these are for
final securing.
1
3
2
When the panel is aligned into wall profile and on the footplate post block, drill through the
slot holes at its longest position and hold the panel in place with the 4x10mm screws.
Note: Only secure the secondary fixing holes in the final installation steps.
Install Fixed Panel
Step 3
Installation