-Remove the connections cover (D).
-Separate the front (B) from the box (A).
-Choose the most suitable cable entry for the facility (fig. 2), taking into account that the power supply and defrost
cables must enter on the right-hand side of the box (I).
-Make the holes for the glands.
-Drill 3 holes on the wall following the box fixing holes (E) (fig. 5).
-Insert and tighten the 3 plug (F).
-Insert the cables through the glands.
-Connect the defrost resistors to the contactor
K1
output (terminals 1, 3, 5 and 13). Next connect the three-phase
power supply cables to
F1
circuit breaker and make the connections shown in the wiring diagram.
-Install the flanges according to figure 4, making sure the cables do not touch the electronic board when
assembling the front part (B).
-Connect the battery (See page 16).
-Assemble the front on the box (B) carefully making sure that the cables are not pinched.
-Insert and tighten the two screws on the front (G).
-Connect the cables of the
K1
contactor coil (red cables) to terminals 42 and 43.
-Connect the power supply cable (J) to the device's input
-Connect the rest of the wiring following the diagrams in section 4 and position the flanges according to figure 3.
-Close the connections cover (D), insert and tighten the fixing screws (H).