[AKD4637-B]
<KM120603>
2018/10
- 2 -
Operation Sequence
(1) Set up the power supply lines.
(1-1) In case of using the power supply connectors. <Default>
JP13
AVDDSEL
JP11
USB5V
5V
3.3V
(1-2) In case of supplying the power from regulator.
JP13
AVDDSEL
JP11
USB5V
5V
3.3V
Name of
Jack
Color
Default Setting
Using
REG1
red
5V
for regulator input
GND1
black
0V
ground
Table 1. Set up of power supply lines
(2) Set up the evaluation mode, jumper pins and DIP switch. (See the followings.)
(3) Power on
.
The control software must be opened after the power supplies are applied.