9
Air Flow Flapper Preparation
5.
Mark the flappers location under the cabinet.
6.
Cut out a rectangle a little bit larger than the air flow flapper under the cabinet. Also, cut out a circle
where the white, green, and black wires would be.
Complete Preparation
1.
Determine and make all necessary cuts in the wall for the vent system. Install the vent system
b
efore installing the hood. See Page 6 “Ventilation Requirements” Section.
2.
Determine the required height for the home power supply cable and drill a 1¼" (3.2 cm) hole at this
location.
3.
Run the home power supply cable according to the National Electrical Code or CSA Standards and
local codes and ordinances. There must be enough conduits (½") and wires from the fuse box
(circuit breaker) to make the connection in the hood’s electrical terminal box.
a.
IMPORTANT:
Do not reconnect power until installation is complete.
4.
Use caulking sealant to seal all openings.