
www.aja.com
28
FS4 Frame Synchronizer/Converter v1.1
Unpacking
Shipping Box
Contents
An FS4 chassis is shipped with two AC power cords and any late-breaking news bulletins
(if applicable). Chassis rackmount brackets are provided as part of the chassis with
screws.
Figure 6. Shipping Box Contents
As you unpack the shipping box, carefully examine the contents. Ensure you received
everything and that nothing was damaged during shipment. If you find any damage,
immediately notify the shipping service and supply them with a complete description of
the damage. AJA will repair or replace damaged items.
If you find shipping damage, contact your AJA dealer or distributor for details on how to
have your FS4 repaired or replaced.
NOTE:
Save packing materials and the shipping box. If your FS4 ever requires service or you move
your system, use the packaging materials and box for safe shipment.
Installing Optional SFP I/O Modules
The optional AJA SFP I/O modules are purchased separately from the FS4. Install the
optional SFP I/O modules by inserting them into the rectangular cages on the back panel
with the electrical connectors facing downward. Press gently but firmly until the
modules seat in the inside connectors.
You must remove any connected fiber or coaxial cables from the SFP modules before you
remove the modules from the FS4. Pull down the SFP lever to free the module before you
withdraw the module from the cage.
For additional installation and operation details, see the instructions provided with the
SFP modules.
FS4 Chassis Installation
The following information will help you install the FS4 chassis correctly.
Physical
Requirements for
Mounting the
Chassis
You can mount the FS4 chassis in two ways:
• Rackmounting—attach the FS4 (rear or front mounted) to a standard 19-inch wide
equipment rack. The chassis occupies only one vertical rack unit.
• Desktop—lay it on a horizontal flat surface.
AC Power Cords (2)
AJA FS4 Panel Chassis