11
6) Removing the LVR, ROLLER ASSY
(1) Insert the LVR, ROLLER ASSY L and R into the HLDR ASSY CLAMP.
(2) Insert the SHAFT A into the BASE HOLE A.
(3) Insert the GEAR,SHAFT B into BASE HOLE B.
(4) Insert the SPRINGs C1 and C2 into the BASE SLITs C1' and C2'.
(5) While pushing down the LVR, ROLLER ASSY, insert the SHAFT D into the BASE HOLE D.
(6) The LVR, ROLLER is fixed at the specified position as shown.
1) SPR-T, ROLLER L, R
HLDR ASSY
CLAMP
2) SHAFT A
3) GEAR, SHAFT B
5) SHAFT D
4) SPRING C1
3) BASE HOLE B’
5) BASE HOLE D’
4) BASE SLIT C1’
4) BASE SLIT C2’
4) SPRING C2
2) BASE HOLE A’
6)
All manuals and user guides at all-guides.com
all-guides.com
Summary of Contents for CX-LMS5
Page 20: ...20 SCHEMATIC DIAGRAM 1 MAIN 1 2 HP J All manuals and user guides at all guides com...
Page 23: ...23 SCHEMATIC DIAGRAM 3 FRONT All manuals and user guides at all guides com...
Page 24: ...24 SCHEMATIC DIAGRAM 4 AMP All manuals and user guides at all guides com...
Page 28: ...28 SCHEMATIC DIAGRAM 6 AC 2M PT MAIN All manuals and user guides at all guides com...
Page 33: ...33 ANODE CONNECTION All manuals and user guides at all guides com...
Page 34: ...34 All manuals and user guides at all guides com...
Page 35: ...35 PIN CONNECTION All manuals and user guides at all guides com...
Page 36: ...36 IC BLOCK DIAGRAM All manuals and user guides at all guides com a l l g u i d e s c o m...
Page 37: ...37 All manuals and user guides at all guides com...
Page 38: ...38 All manuals and user guides at all guides com...
Page 49: ...49 MECHANICAL PARTS ARRANGEMENT 1 5 All manuals and user guides at all guides com...
Page 50: ...50 MECHANICAL PARTS ARRANGEMENT 2 5 All manuals and user guides at all guides com...
Page 52: ...52 MECHANICAL PARTS ARRANGEMENT 4 5 All manuals and user guides at all guides com...
Page 53: ...53 MECHANICAL PARTS ARRANGEMENT 5 5 All manuals and user guides at all guides com...