6
2 Installation and Configuration
2.1 Package Inspection
Scope of delivery
Item
Quantity
Smart Grid Converter
1
AC plug
1
USB 2.0 cable
1
Nameplate
The nameplate is affixed to the converter and provides the following information:
•
Model name
•
DC input data
•
AC output data
•
Certification
2.2 Mounting
Requirements for the mounting location
•
A solid support surface must be available for mounting.
•
The mounting location must be suitable for the weight and dimensions of
the converter.
•
The mounting location should be freely and safely accessible at all times.
•
Climatic conditions must be met.