Refrigerant Cycle (Cooling Mode)

Eubank air conditioners use R-410A refrigerant in a conventional vapor-compression refrigeration cycle 

to transfer heat from air in an enclosed space to the outside. A double blower assembly blows indoor 

air across the evaporator. Cold liquid refrigerant passing through the evaporator is boiled into gas by 

heat removed from the air. The warmed refrigerant gas enters the compressor where its temperature and 

pressure are increased. The hot refrigerant gas condenses to liquid as heat is transferred to outdoor air 

drawn across the condenser by the condenser fan. Liquid refrigerant is metered into the evaporator to 

repeat the cycle. 

Heating Mode

A wall-mounted thermostat controls the heating cycle of models which incorporate resistance heating ele-

ments. On a call for heat, the thermostat closes the heat relay to energize the indoor fan and the resistance 

elements. Except on units with the optional dehumidification kit, the compressor is locked out during the 

heating cycle. Please see Appendix A for instructions on field installing electric heaters.

Economizer Operation

The economizer is a regulated damper system with controls. The damper regulates the circulation of outside 

air into the enclosure (when the outdoor air conditions are suitable) to reduce the need for mechanical 

cooling, save energy, and extend compressor life. 
Depending upon the options selected, the damper responds to the enthalpy of the outdoor air. On a call 

for cooling from a space thermostat, it operates as follows:
When the enthalpy of the outdoor air is below the set point, the outdoor air damper is proportionally open 

(and return air damper is proportionally closed) to maintain between 50°F and 56°F (10°C to 13°C) at 

the mixed/discharge air sensor. Integral pressure relief allows the indoor air to exit the shelter through 

the air conditioner.
When the enthalpy of the outdoor air is above the set point, the outdoor air damper closes to its minimum 

position. A call for cooling from the space thermostat brings on mechanical cooling.
A built-in adjustable minimum position potentiometer controls the amount of outdoor air admitted to 

meet minimum ventilation requirements. 

1.6 

Optional Controls & Packages

Hard Start Kit

Used on single phase equipment to give the compressor higher starting torque under low voltage conditions. 

Generally not recommended on units with scroll compressors.

Extreme Duty Package

The Extreme Duty Package allows selected Eubank air conditioners to operate in extremely cold and hot 

ambient conditions. The Extreme Duty Kit is always factory installed. Non-economizer air conditioners 

will operate from 0° F to 131° F (-18° to 55°C). Economizer equipped air conditioners will operate from 

-40° F to 131° F (-40° to 55°C).
The  Extreme  Duty  Package  includes  a  suction  line  accumulator,  thermal  expansion  valve  (TXV), 

crankcase heater, hard start kit, an auto reset, high pressure switch and an outdoor thermostat and fan 

cycle switch. The fan cycle control is standard on all Eubank air conditioners and operates based upon 

the liquid line pressure. The outside thermostat closes whenever the outside temperature is below 50°F 

(10°C) and opens when the outside temperature is 50° F (10°C) or higher. Whenever the temperature is 

below 50°F (10°C), the fan cycle switch is in the circuit; when temperatures are 50° F (10°C) or higher, 

the fan cycle switch is not in the circuit. The fan cycle control is used with a TXV to prevent excessive 

cycling or "hunting" of the TXV.

Summary of Contents for Eubank EAA1020A

Page 1: ...he inside of the building adjacent to the thermostat END USER Retain this manual for future reference Eubank EAA EGA Wall Mount AC Installation Operation Manual 03 2021 Rev 4 Part 03842 Air Conditione...

Page 2: ...IGHT Laying it down on its side may cause oil to leave the compressor and breakage or damage to other components 3 TURN ELECTRICAL POWER OFF AT THE breaker or fuse box BEFORE installing or working on...

Page 3: ...ns on the inside of the building adjacent to the thermostat END USER Retain these instructions for future reference Table of Contents Chapter 1 Eubank Wall Mount Air Conditioner Description Specificat...

Page 4: ...halpy Sensor Temperature Control Points 19 Figure 4 Electrical Controls HVESAAlternate Construction 19 Figure 5 Economizer Control Board 20 Figure 6a Setting the Speed for the Y1 and Y2 Operation for...

Page 5: ...A for instructions on field installation of electric heat Eubank air conditioners feature an exclusive electronic control board The control board consolidates several of the electrical components and...

Page 6: ...bient Fan Cycle Control FCC R Crank Case Heater CCH T Hard Start w EFS U Hard Start w Hot Gas Bypass V Hard Start w Low Ambient CCH EFS W Low Ambient w CCH X Hot Gas Bypass Y Low Ambient w CCH FCC Z L...

Page 7: ...Wet Coil IWG MODEL INCHES MILLIMETERS PART NUMBER FILTERS PER UNIT MERV RATING EAA1020 1024 30 x 16 x 2 762 x 406 x 52 80138 1 8 EAA1030 1036 1042 36 x 22 x 2 927 x 559 x 52 80162 1 8 EAA1048 1060 18...

Page 8: ...r air damper is proportionally open and return air damper is proportionally closed to maintain between 50 F and 56 F 10 C to 13 C at the mixed discharge air sensor Integral pressure relief allows the...

Page 9: ...ained at or below a certain humidity set point These units do not have the ability to add humidity to the building IMPORTANT The electrical wire and breaker or fuses must be sized for simultaneous ope...

Page 10: ...perate in extremely cold temperatures The kit includes a suction line accumulator thermal expansion valve TXV crankcase heater hard start kit and an outdoor thermostat and fan cycle switch The fan cyc...

Page 11: ...long as primary power is available The heater drives liquid refrigerant from the crankcase and prevents loss of lubrication caused by oil dilution Power must be applied to the unit for 24 hours before...

Page 12: ...12 Eubank EAA EGA Wall Mount AC Installation Operation Manual 03 2021 Rev 4 Figure 1a Typical Electrical Schematic Non Economizer Model EAA...

Page 13: ...Eubank EAA EGA Wall Mount AC Installation Operation Manual 03 2021 Rev 4 13 Figure 1b Typical Electrical Schematic Economizer Model EAA...

Page 14: ...14 Eubank EAA EGA Wall Mount AC Installation Operation Manual 03 2021 Rev 4 Figure 1c Typical Electrical Schematic Economizer Model EAA Alternate Construction...

Page 15: ...Eubank EAA EGA Wall Mount AC Installation Operation Manual 03 2021 Rev 4 15 Figure 1d Typical Electrical Schematic Economizer Model EAA Alternate Construction...

Page 16: ...16 Eubank EAA EGA Wall Mount AC Installation Operation Manual 03 2021 Rev 4 Figure 1e Typical Electrical Schematic Economizer Model EGA Alternate Construction...

Page 17: ...the changeover to outside air for free cooling The control board must be configured for proper operation of the economizer by selecting the desired changeover temperature The desired temperature is s...

Page 18: ...per Minimum Position Potentiometer W2 jumper The potentiometer controls the amount of outside air introduced in the building when the economizer damper closes or the air conditioner is Off or in Mecha...

Page 19: ...orsarecurrentlytheonlybrandofsensorsusedintheairconditioners Jumper W3 allows us to use alternative brands at a future date On all current air conditioners pins 1 2 are jumpered on W3 See item 4 in Fi...

Page 20: ...osition Potentiometer 0 to 100 Factory setting is 50 2 Field connection from CommStat 4 2 terminal 5 For Honeywell sensors 8 W2 Minimum Position Potentiometer Jumper Jumper Pins 1 2 to Disable Factory...

Page 21: ...ng valuable information to the end user Special features include 2 Stage operation with varying speed control to optimize latent and sensible capacity built in remote communication MODBUS for monitori...

Page 22: ...gh Pressure Switch LP Low Pressure Switch Switch to Be Closed for Cooling Operation Switch to Be Connected to R Node 16 24 VAC Power Input to PCB 17 Digital Outputs 24 VAC The PCB Makes and Breaks R R...

Page 23: ...propriate signal terminations must be used This jumper will be factory installed In replacing the PCB verify the necessary signal and configure the board accordingly Only 2 of the 3 pins should be use...

Page 24: ...the potentiometer See figure below 3 1 2 1 Set for 0 10V Signal Jumper To Remain On The Appropriate Terminal For Correct Operation 2 Set For PWM Signal Jumper To Remain On The Appropriate Terminal For...

Page 25: ...ts per second The board also allows 15 different MODBUS addresses based on the position of the NET ADDRESS DIP switches The Net Addresses are written in Binary see table below with switch 4 being the...

Page 26: ...dedcommissioning startupsequence to ensure safety and system reliability This document is only valid if the system is used as intended This section defines the manner and method of control of the HVAC...

Page 27: ...s as follows 1 Stage 2 Cooling Request Y2 Input 2 Stage 1 Cooling Request Y1 Input 3 Electric Heat Request W2 Input 4 Dehumidification Request Hum Input 5 Indoor Fan Request G Input Note The priority...

Page 28: ...apacity Only CC1 output can achieve partial capacity Both CC1 and CC2 outputs are required to achieve full capacity Request Active Input Active Output Stage 1 Cooling 1 Fixed Compressor Y1 CC1 Partial...

Page 29: ...cooling operation In the event that the fault occurs a second time on the same call for cooling the system locks out To clear the fault the Cooling request must be cycled or the system must be power...

Page 30: ...e sensor has to be configured via MODBUS Once configuration is complete the unit has the capability to function autonomously to maintain the space temperature Discrete Registers Read with Function Cod...

Page 31: ...Setting 16 Bit 1 60 default 25 represents minutes of allowed MODBUS inactivity before switching to onboard T Stat mode RW 10 Current OFM Speed 16 Bit 0 1023 RO 11 Current IFM Speed 16 Bit 0 1023 RO 12...

Page 32: ...pressor will not start makes excessive noise or will not pump return the unit to the freight carrier 3 2 Installation Requirements General 1 Inspect unit for completeness Check for missing parts e g h...

Page 33: ...cm 24 inches 61 cm 6 inches 15 cm 1030 1036 30 inches 76 cm 18 inches 46 cm 24 inches 61 cm 6 inches 15 cm 1042 1048 1060 30 inches 76 cm 30 inches 76 cm 24 inches 61 cm 6 inches 15 cm 1072 30 inches...

Page 34: ...1 stage cool 7 day programmable Fan switch Auto On Auto change over Keypad lockout Non volatile program memory P N 50123 Digital thermostat 2 stage heat 2 stage cool 7 day programmable Fan switch Auto...

Page 35: ...manual is intended for use by a qualified service agency that is experienced in such work is familiar with all precautions and safety procedures required in such work and is equipped with the proper...

Page 36: ...hin 4 feet 122cm of the unit Galvanized metal duct extensions should be used to simplify connections to duct work and grilles Use fabric boots to prevent the transmission of vibration through the duct...

Page 37: ...on the wall You must stabilize the unit on the bracket with the lifting device or by some other means the bracket alone is not sufficient 3 Make sure that the duct flanges are properly aligned with t...

Page 38: ...ned system with small critical refrigerant charges where the installation of gauges may be objectionable can be made by monitoring the temperature of the refrigerant lines at the compressor The temper...

Page 39: ...e the field power leads connected to the internal circuit breaker on one of the units only D Restore power and retest the phase step B When the voltage reads 0 the units are in phase E Turn off power...

Page 40: ...mStat 3 Controller is a solid state control package designed to operate a fully or partially redundant air conditioning system for a telecommunication cabinet or shelter The CommStat 3 Controller is f...

Page 41: ...O Dry Contacts NC C NO High Building Temp Alarm Dry Contacts NC C NO 5 Connect to Normally Closed NC dry contacts from smoke alarm SMOKE ALARM JUMPER NOTE IF LINE VOLTAGE IS BELOW 220 VAC USE THE 208...

Page 42: ...conomizer Equipped models only To check the system operation under different ambient conditions the air temperature and enthalpy sensors must be tricked When outdoor ambient condi tions are higher tha...

Page 43: ...art with a visual check are there loose wires crimped tubing missing parts etc Begin deeper analysis only after making this initial inspection The troubleshooting information in this manual is basic T...

Page 44: ...or airflow restrictions e g the air filter Check blower motor and condenser fan 2 Restriction in refrigerant circuit 2 Check for blockage or restriction especially filter drier and capillary tube asse...

Page 45: ...leakage with a megoh meter Attach one lead to the compressor case on a bare metal tube and to each compressor terminal to test the motor windings A short circuit at high voltages indicates a motor def...

Page 46: ...as dried before restarting Condenser Periodicallyinspecttheoutdoorcondensercoilandthecabinetairreliefsfordirtorobstructions Remove foreign objects such as leaves paper etc If the condenser coil is dir...

Page 47: ...or any other material charges 2 Damages caused by shipping accident abuse negligence misuse fire flood or Acts of God 3 Damages caused by operating or staging the unit in a corrosive environment 4 Dam...

Page 48: ...___________________________ Compressor Model No ______________________________________________ Serial No ______________________________________________ B Pre Start Up Is there any shipping damage Yes...

Page 49: ...Deviation from avg voltage ______________volts Voltage imbalance 100 x Max Deviation avg Voltage ___________ A voltage deviation greater than 2 with the unit running should be addressed and corrected...

Page 50: ...r DB Temp ________ ________ Evap Leaving Air WB Temp ________ ________ Heater Contactor Amps L1 ________ ________ Heater Contactor Amps L2 ________ ________ Heater Contactor Amps L3 ________ ________...

Page 51: ..._ Compressor Amps L3 ________ ________ Notes _________________________________________________________________________ _________________________________________________________________________ _______...

Page 52: ...n all four sides of the supply outlet duct flange on the unit The 1 25 4 mm clearance must extend on all sides of the supply duct for the first 3 feet 1 meter from the unit IMPORTANT Eubank requires a...

Page 53: ...r all other heaters 6 Install the two No 10 screws in the heater assembly plate 7 Install wire harness in hole provided in drain pan and then through filter bracket and then into control box 8 Wire th...

Page 54: ...54 Eubank EAA EGA Wall Mount AC Installation Operation Manual 03 2021 Rev 4...

Reviews: