FINAL TASKS
1. Replace all valve caps and ensure that they are tightened properly.
2. Fill gaps on the wall between hole sides and tubing with sealer.
3. Attach wiring and tubing to the wall with clamps where necessary.
4. Operate the air conditioner together with the customer and explain all
functions.
5. Explain filter removal, cleaning and installation.
6. Give the operating and installation manuals to the customer.
9