20
9. FINAL TASKS
1. Return the stoppers and covers to their place and check that they are well closed.
2. Seal all the cracks and holes at the sides of the pipes and bores.
3. Attach the electrical wires and pipes to the wall with clamps.
4. Check all the operations of the air-conditioner. If necessary, use the operating manual.
4.1 Indoor
unit
−
Are all the remote commands received on the air-conditioner control panel?
−
Do the lamps on the control panel work properly?
−
Does the air-conditioner execute all the remote control commands?
4.2 Outdoor
unit
−
Check for any abnormal noise or vibrations during operation of the air conditioner.
−
Check that the noise, condensate drainage or air flow does not disturb the neighbors.
5.
Run the air-conditioner for cooling and heating
−
Explain to the customer together with the operating instructions:
−
How to remove, clean and replace the filter.
−
How to turn the air-conditioner on and off.
−
How to choose between heating and cooling and how to set the desired temperature.
−
How to adjust on or off time using the timer.
−
How to operate the air conditioner from the control panel.
−
Give the customer the operating and installation manuals.
−
Help the customer to fill in the guarantee certificate.