background image

L

L

N

N

F1 F2 R1 R2

L

N

F1

F2R

1

R2

ELB

Power

Beraker

220~240V AC

50Hz

Size

Tightening torque

Remote controller and main bus communication wiring and forced off 

terminal block(4P)

M3.5

0.8~1.0N.m

Power supply and Ground terminal block(2P)

M4

1.2~1.5N.m

Electrical characteristics

Specification for field supplied ELB and wire

Unit

Power supply

Fan motor

Model

Hz

Volts

MCA

MFA

KW

FLA

CKV007

50

220~240

0.27

16

0.06

0.18

CKV009

0.27

16

0.06

0.18

CKV012

0.27

16

0.06

0.18

CKV015

0.55

16

0.10

0.32

CKV018

0.55

16

0.10

0.32

MCA : Min. Circuit Amps (A)

MFA : Max. Fuse Amps(A)

KW   : Fan Motor Rated output(kW) 

FLA  : Full Load Amps(A)

Model

Power supply wiring

Remote controller wiring

Main bus wiring

Field ELB

Wire and Size

Wire

Size

CKV007

16A

Must comply

with maximum

current and local

codes(0.75mm

2

 )

Twisted-pair 

wires

1.0mm

2

CKV009
CKV012
CKV015
CKV018

BEFORE POWER ON

 

� 

 Is there any gas leakage at flare nut connections?

 

  Has the heat insulation been carried out at flare nut connection? 

 

� 

 Is the connecting cable being fixed to terminal board firmly? 

 

  Is the connecting cable being clamped firmly?

 

� 

 Is the drainage ok? (Refer to “Drainage test” section) 

 

� 

 Is the earth wire connection properly done?

 

� 

 Is the indoor unit properly hooked to the installation plate? 

 

 I s the power supply voltage complied with rated value?

AFTER POWER ON

 

� 

 Is there any abnormal sound?

 

  Is the cooling operation normal?

 

  Is the thermostat operation normal?

 

� 

 Is the remote control’s LCD operation normal?

     NOTE: For the piping and wiring methods,leakage test,vacuum process and installation setting 

                 through HMI, please refter to “Outdoor unit Installation Manual”.

NOTE:

� 

 

All field supplied parts and materials and electrics 

works must conform to local codes.

� 

 

Use copperwire only.

� 

 

All wiring must be performed by an authorized 

electrician.

� 

 

Every indoor unit must have a sub circle breaker 

and the whole system must have a main circle 

breaker. 

� 

 

Be sure to ground the air conditioner.

� 

 

The appliance shall be installed in accordance with 

national wiring regulations ,and shall be provided 

to ensure all-pole disconnection from the supply 

mains, and distance between the poles shall be 

more than 3 mm .

 CHECK ITEMS

ELB: Electricity leakage breaker.

Press the wires under the clips tightly.

Fig 16

Fig 15

Reviews: