Printed Documentation
72
Central Terminal Card Installation
The CT rack is shipped with shelves fitted to customer requirements and internal cabling
complete.
Preliminary
In a new installation ensure that the CT Circuit Breakers located on the lower assembly of the
Combiner Shelf are set to the OFF position (Down). See and that the breakers on the Fuse
and Alarm panel of the Expansion Rack are switched are set to the OFF position (down) See.
Warning:
Before handling any cards or modules, observe full anti-static
precautions
CAUTION PA INSERTION
Care should be taken when installing PAs to ensure that the card connector mates with the
backplane connector correctly. Any attempt to ram the card home or force the card into he
slot may cause damage to the connector. Insert the card until the connectors engage, ease
the card into the backplane until fully engaged. Lock top and bottom with a screwdriver. If
resistance is met, remove the card and reinsert. If difficulty persists contact the Airspan
service centre.
CAUTION DIP/LNA INSERTION
Care should be taken when installing DIP/LNAs to ensure that the card connector mates with
the backplane connector correctly. Any attempt to ram the card home or force the card into he
slot may cause damage to the connector. The board extractor levers may be used to assist
with insertion, when the card is home press the body of the DIP/LNA to ensure that the
connector is fully engaged. If resistance is met remove the card and reinsert. If difficulty
persists contact the Airspan service centre.
WARNING:
Isolation of power from the rack is only achieved by ensuring that both
circuit breakers are in the off position.
Part of RF Combiner Shelf showing Circuit Breakers.
Summary of Contents for AS4000
Page 2: ......
Page 6: ...Printed Documentation 2 ...
Page 14: ...Printed Documentation 10 ...
Page 16: ...Printed Documentation 12 ...
Page 27: ...Installation 23 Typical 75ohm DDF Layout ...
Page 28: ...Printed Documentation 24 ...
Page 41: ...Installation 37 ...
Page 42: ...Printed Documentation 38 BNC Terminations to Coax ...
Page 43: ...Installation 39 Type 43 Terminations to Coax ...
Page 44: ...Printed Documentation 40 ...
Page 52: ...Printed Documentation 48 ...
Page 68: ...Printed Documentation 64 ...
Page 71: ...Installation 67 ...
Page 72: ...Printed Documentation 68 CT Rack Labelling Central Terminal Rack ...
Page 73: ...Installation 69 BNC Terminations to Coax ...
Page 74: ...Printed Documentation 70 Type 43 Terminations to Coax ...
Page 75: ...Installation 71 ...
Page 78: ...Printed Documentation 74 Card Insertion DA Rack Card Insertion Expansion Rack ...
Page 110: ...Printed Documentation 106 ...
Page 112: ...Printed Documentation 108 Combiner Shelf PSU ...
Page 133: ...Setup and Test 129 ...
Page 163: ...Setup and Test 159 ...
Page 166: ......
Page 170: ...Printed Documentation 166 ...
Page 176: ...Printed Documentation 172 ...
Page 192: ......