AS4000 Subscriber Terminal
Installation and Commissioning
GSI-005
605-0000-454
Draft Issue 1.3 Date 8/02/00
Page 7 of 14
5.1
B Series Installation Check List.
Check site meets site selection criteria
q
Position and fix Antenna mounting bracket
q
Install Antenna
q
Fix Interface Unit to wall (unless free standing required)
q
Install power unit Type 5/6
q
Run drop cable
q
Plug connector into Antenna
q
Terminate the F-type drop cable connector at interface unit
q
Programme Interface Unit
q
Pan Antenna
q
Measure and record RSSI voltage on test form
q
Functional tests record result on test form
q
Clear and tidy site
q