
AirSpeed 1050 B3 Installation Guide
DUG01593
Airspan Commercial and Internal Use
30
Note:
After locking the secondary lock/button and lever, it is required to fasten down the lever
mechanism with the supplied metal/plastic tie (to prevent easy opening) and verify that it is secure,
as shown below.
Figure 25: AC Housing Lock Secured
Note:
When securing the cable verify there is no tension on the connector so that it is easy to
disconnect and re-connect for future maintenance actions
.
4.5.2 Fiber Ethernet (SFP) Cable Preparation
Note:
Additional parts required for the SFP assembly:
LC Duplex cable assembly
SFP Transceiver
The following displays the proper steps for SFP cable preparation:
1.
Have the pre-assembled LC Duplex cable assembly ready.
Figure 26: Stripping Dimensions (SFP Cable)
Note:
Diameter of cable is in the 4.8 to 5.8 mm (0.19-0.23 in) range.
Figure 27: Pre-assembled LC Duplex Cable
1.
Open the housing lock by sliding up then lift the clamp handle,