
Air4G Installation Guide
Page 38
Commercial in Confidence
UGD-D00229 Rev B
Figure 17 – Pole Mounted Air4G
To mount the Air4G in the pole mount configuration (for poles 60 > 120 mm), perform the
following steps:
1. Attach the two (2) pole brackets (as shown in Table 14) to the pole (with the threaded
holes facing up) at the heights required to attach the Air4G. This comes as a set of two
(2), upper and lower pairs.
Figure 18 - pole bracket for 60 > 120 mm
2. Tighten upper pole bracket and hand tighten (loosely) the lower pole bracket for later
adjustment.
Caution:
These units weigh 17 kg – 17.6 kg, take care when lifting.
3. Lift and align the Air4G unit and place the screws through the head clearance holes and
position the unit so that the top mounting holes retain the unit and loosely tighten all
screws.
4. Tighten all fixing screws.
5.2 Wall mount configuration
The following image shows the wall mount assembly.
Figure 19 – Wall Mounted Air4G