2.4 Equipment Required
The following is a list of the equipment required for installing the AirMux-200
hardware.
•
RJ-45 crimp tool (If pre-assembled ODU/IDU cable is not used)
•
Drill (for wall mounting only)
•
IDU and ODU grounding cable
•
13 mm (1/2
″
) spanner
•
ODU to IDU cable if not ordered (Outdoor class, CAT-5e, 4 twisted pairs)
•
Cable ties
2.5 Installation and Setup
The AirMux-200 system installation is achieved by following the steps listed below:
1. Installing ODU at both sites of the link.
2. Assembling the ODU cable and connecting ODU to IDU at both sites.
3. Connecting the power.
4. Aligning the ODUs.
5. Installing the management program on the network management station.
6. Running the Installation wizard from the management program.
7. Connecting user equipment to the local and remote IDUs.