background image

15

ceiling (2) can also be performed between the air handling 
unit (1) and the wall/roof (2) at position (5) before fitting 
the air handling unit.

Depending on the condition of the wall/ceiling and the 
dimensions of the air handling unit, a sealant that retains 
elasticity over the long term or expanding sealing tape 
can be used to obtain a flexible seal. This material is to be 
applied to the rear of the unit around the air connection 
fittings, or at the side of the duct holes on the wall to even 
out irregularities on the wall/ceiling.

3.7. 

Fitting of Panels

 

The panels must only be fitted once the unit, complete 
with all equipment, has been fitted and connected, and 
the functions of the unit thoroughly tested. 

Press the panels to the clips on the unit until they attach 
securely to the clips.

The perforated circles in the side and rear panels should 
not be removed until required for ducted connections.

a: 

Left panel.

b: 

Rear panel.

c: 

Right panel.

D: 

Perforated section for extraction for DE version.

E: 

Perforated section for exhaust for H version.

F: 

Perforated section for intake for H version.

G: 

Perforated section for intake in S1 version or 

 

exhaust in S1 and S2 versions.

H: 

Perforated section for intake for S2 version.

a

b

c

D

E

F

G

H

3.8. 

Installation Check

 

 

 

                yes  no

Serial number noted 
Wall frame fitted 
Unit fitted 
Ceiling fittings attached 
Ducts and grilles fitted 
Roof cap fitted 
Screws retightened 
Panels fitted 

  

Name of installation engineer:

Comment:

Summary of Contents for AM 1000

Page 1: ...1 2 3 AM 1000 INSTALLATION...

Page 2: ...unit should not be used without the filters specified in the Operator s Manual The manufacturer cannot be held liable for damage arising from use or installing in contravention of these instructions T...

Page 3: ...Sealing the Gaps Around Ducts 14 3 7 Fitting of Panels 15 3 8 Installation Check 15 Appendix 1 Dimensional Drawings 16 AM 1000 HH T 16 AM 1000 HH B 17 AM 1000 HH DIDE 18 AM 1000 HS2 T 19 AM 1000 VV T...

Page 4: ...4...

Page 5: ...note 1 Airmaster air handling unit 4 sections 2 Wall Ceiling frame 3 3 split service cover 4 Panel set a set consists of one to three long panels and double that number of short panels 5 Control panel...

Page 6: ...re restored and fully functional once the unit has been installed NB Read this section Installation fully before start ing installation NB The wall to which the unit is fitted must have an evensurface...

Page 7: ...toration of the function of the vapour barrier is optional available and can be delivered by Airmaster Important Ductholesinthewallmusthaveanoutward downward gradient of 1 2 to prevent heavy rain from...

Page 8: ...al fit the wall frame if necessary 3 Mark the holes for the ducts according to Appendix 1 Dimensional Drawings 4 Drill all marked holes NB Thedrillingofholes sizeoftheholesandmaterials used for fittin...

Page 9: ...hes to thesection Thisunderlaymayforexamplebestrong clean cardboard or equivalent NB Avoid damaging the profile in the middle of the centre section 2 Push the section against the wall frame and screw...

Page 10: ...ction 9 Fasten the section to the centre section Two bolts are mounted in the left section and three screws are supplied loose with the sections 10 Lift the right section using appropriate lifting equ...

Page 11: ...ection wires and secure them at the control box 17 Lift the base plate to its top position and secure it 18 Lift the front section using appropriate lifting equipment to the centre section NB Whenlift...

Page 12: ...x 2 through the cable strip 3 to the side of the right section of the air handling unit NB Do not bend the condensate drain hose 25 Lead the condensate drain hose out of the front section at the right...

Page 13: ...strong clean cardboard or equivalent 30 Lift the side covers to the centre covers one at a time using appropriate lifting equipment Hang the service cover slanted on to the side cover push it up again...

Page 14: ...andards and rules in effect must be observed NB The installation of ventilation ducts should be performed according to standards and rules in effect NB Exhaust air ducts and supply air ducts must be i...

Page 15: ...ent has been fitted and connected and the functions of the unit thoroughly tested Press the panels to the clips on the unit until they attach securely to the clips The perforated circles in the side a...

Page 16: ...6 579 14 70 260 330 330 240 90 14 397 36 87 45 87 41 250 66 42 156 1770 262 i k h Appendix 1 16 Appendix 1 Dimensional Drawings AM 1000 HH T 1 Exhaust 2 Supply 3 Inlet 4 Extract 5 Wall frame Ceiling f...

Page 17: ...579 14 70 260 330 330 240 90 14 397 45 427 41 250 66 42 156 629 35 1160 35 466 i k h 2 5 6 7 3 8 4 1 9 B Appendix 1 17 AM 1000 HH B 1 Exhaust 2 Supply 3 Inlet 4 Extract 5 Wall frame Ceiling frame 6 C...

Page 18: ...90 14 397 976 30 629 35 1160 35 466 34 36 87 1162 219 45 87 41 250 66 42 156 1770 262 i k h 3 8 6 7 2 5 1 4 9 B Appendix 1 18 1 Exhaust 2 Supply 3 Inlet 4 Extract 5 Wall frame Ceiling frame 6 Condensa...

Page 19: ...579 14 70 260 330 330 240 90 14 397 976 30 629 35 1160 35 466 219 45 87 41 42 156 250 66 2008 262 i h Appendix 1 19 1 Exhaust 2 Supply 3 Inlet 4 Extract 5 Wall frame Ceiling frame 6 Condensate drain 7...

Page 20: ...6 250 66 h 1770 262 i k 1214 1244 315 2325 560 315 6 2 8 3 6 7 5 4 1 9 B Appendix 1 20 1 Exhaust 2 Supply 3 Inlet 4 Extract 5 Wall frame Ceiling frame 6 Condensate drain 7 Electrical Connections 8 Cei...

Page 21: ...56 251 h 1770 262 i k 315 2295 560 1214 1244 2325 1199 315 6 6 7 3 1 2 8 4 5 9 B Appendix 1 21 1 Exhaust 2 Supply 3 Inlet 4 Extract 5 Wall frame Ceiling frame 6 Condensate drain 7 Electrical Connectio...

Page 22: ...41 250 66 42 156 34 h 1770 262 i k 2370 2325 560 1214 1244 315 783 257 315 315 6 Appendix 1 22 1 Exhaust 2 Supply 3 Inlet 4 Extract 5 Wall frame Ceiling frame 6 Condensate drain 7 Electrical Connectio...

Page 23: ...50 66 42 156 629 35 1160 35 466 262 i h 1214 1244 347 1199 315 560 2310 2325 315 6 Appendix 1 23 1 Exhaust 2 Supply 3 Inlet 4 Extract 5 Wall frame Ceiling frame 6 Condensate drain 7 Electrical Connect...

Page 24: ...0 90 14 397 629 35 1160 35 466 976 30 36 87 34 45 427 41 520 262 257 250 66 42 156 3 6 7 5 1 2 8 4 9 B Appendix 1 24 1 Exhaust 2 Supply 3 Inlet 4 Extract 5 Wall frame Ceiling frame 6 Condensate drain...

Page 25: ...H HREHRE VH S1S2 S1RES2RE HV VV VS2 HS1 VS1 HS2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 T B DI DE DIDE 3 4 3 3 3 3 4 4 4 4 Appendix 1 25 Model Versions AM 1000 1 Exhaust 2 Supply 3 Inlet 4 Extract...

Page 26: ...258 315 1162 257 583 315 257 1162 783 258 583 315 315 87 305 1464 305 163 260 36 1353 113 305 215 305 109 260 36 114 128 Appendix 1 26 Version DI Version DE Version DIDE Version HREHRE Version S1RES2...

Page 27: ...325 16 0 325 16 0 60 251 30 30 1500 1500 2 1 2 1 325 16 0 325 16 0 60 251 1500 1500 2 1 2 1 60 mm 60 mm Appendix 1 27 Holes to be Drilled for Air Ducts VV VH VS1 VS2 1 Exhaust 2 Supply...

Page 28: ...14157 Version 2018 01 09 Industrivej 59 Tel 45 98 62 48 22 info airmaster dk DK 9600 Aars Fax 45 98 62 57 77 www airmaster as com Denmark...

Reviews: