
8
9
Construction Materials
All ventilation components between the outlet of the ozone generator to and including the connection to the main
exhaust duct must meet stainless steel specification AISI 304. Note: In grease exhaust applications it is common a
stainless steel fire damper is installed in the connection appendage between the generator and main exhaust duct.
Due to the potential for corrosion in this small section of duct, be sure to add regular inspections/replacement of any
non-stainless components such as fusible links or sensors accompanying it (twice/year recommended) to the regular
maintenance schedule for the facility.
Hanging the Generator
The ozone outlet pipe
6
may have a maximum length of 15 ft. Its preferred diameter is 5 in. with a minimum diameter
of 3 in. Make sure that your installation does not block any inspection hatches or other equipment in the facility.
1. Hang the ozone generator.
7
The ozone generator must always be suspended horizontally by its brackets with the service hatch facing downward.
Never screw or drill through the generator. Hang using 5/16 in. threaded rods and anchor these with nuts on each
side of the respective bracket.
2. Fasten the outlet pipe
6
between the ozone generator
7
and the eventual connecting point to the exhaust duct.
3. Connect the inlet pipe
8
and IRIS air damper
10
to the ozone generator
7
, or use a filter box
9
with a MERV5/
EU3 filter according to the pictures below.
Make sure that all connections are properly fastened and sealed.
TO HOOD
OR DUCT
FILTER BOX INSTALLATION
CENTRAL AIR INSTALLATION
MERV5 / EU3
FILTER BOXES
TO HOOD
OR DUCT
IRIS DAMPERS
For Bleed Airflow rates, see section 2 “Planning Your Installation”
AirMaid
2000V/5000V
10000V
AirMaid
20000V
Note that the direction of the airflow
must correspond to the arrows on the generator and the pictures below.
Filtered air is required. On models with multiple pipes, you may manifold together supply and discharge pipes to single
connections as long as the resulting installation complies with the product specification for bleed air through the
generator. Remember to add filter inspection/replacement to the maintenance schedule. With central air installations,
IRIS dampers are usually necessary for balancing purposes.
Summary of Contents for 10000V
Page 2: ...2...