Installation and Operating Instructions
2. Boreholes
Position the housing, then mark and drill the holes and mount it with at least two
fastening screws and wall plugs.
3. Backdraft shutter and guide vane
- If required backdraft shutter (included in delivery) can be installed behind the guide
vane (Fig 6).
- During the housing installation, the guide vane should be mounted vertically.
- Before final assembly stick on the rubber foam strips (included in delivery) (Fig 6).
6.3
Electrical installation/Commissioning
Safety instructions listed in Chapter 1.2 should be observed
-
All electrical installations to be carried out by an approved electrician
in accordance with presented manual and wiring diagrams.
-
Fan should be fitted with a 3A fuse at all times.
-
The relevant standards, safety regulations (for instance DIN VDE 0100)
and technical connection regulations of the energy supply company
should be observed!
-
An all-pole mains switch/isolation switch, with at least a 3 mm contact
opening (VDE 0700 T1 7.12.2 / EN 60335-1) is mandatory by law!
-
Network configuration, voltage and frequency of the power source
should match the information on the rating plate.
Fig 5
Fig 4
Fig 6
Fig 7
DANGER