background image

 

 

 

 

 

 

All of the following information and instructions are intended for 
use by authorized electricians. 

 

CHAPTER 6 

 

INSTALLATION 
 

 

6.0 

Scope of delivery / Mechanical Installation  

A visual inspection upon delivery should be performed including a check to ensure all 
components are present. Take the unit out of the box immediately before installation 
in order to avoid possible damage and contamination during the transport as well as 
at the construction site.  

 

Scope of delivery: 
 
1. 

Cover

 

2. 

Terminal compartment 

cover 

incl. 4x fastening screws 

3. 

Control board

  

4. 

Plastic housing 

with impeller  

5. 

Guide vane

,

 

with limited 

mounting depth removable 

 

     

6. 

Backdraft shutter

removable  
7. 

Cable support sleeve 

x 2 

8. 

Mounting kit  

2x screws with plugs  
for a wall mounting   
9. 

Foam strips

     

 

6.1 

Preparation for wall mounting  

   

Safety instructions listed in Chapter 1.2 must be observed

!  

The fan is supplied as a complete unit, which is delivered ready for connection. The 
installation  and  set-up  of  the  fan  should  be  performed  only  after  final  cleaning  to 
avoid damage and contamination of the ventilation unit.   
After unpacking and before installation the following points must be checked: 
- if any transport damage is noticed, 
- broken or bent parts 
- free rotation of the impeller  
 

 

6.2 

Installation 

The  QT150  HT  is  designed  for  direct  wall  mounting.  The  housing  should  not  be 
deformed or warped during the installation. Choose a flat location for mounting. Fans 
can be heavy and are sometimes unwieldy. Proper precautions should be taken, to 
ensure  the  assembly  is  well  supported  and  stable  before  lifting  into  position.  Fans 
should be mounted on a strong and stable surface using appropriate fasteners. 
 

 

 

1. Cable outlet in the wall 

- Position of the cable outlet in the dark area is variable (Fig 4). 
- Clearance to the pipe centre depending on the cable outlet r = 83 mm (at a variable 
position from 0 up to 360

).  

- For an easy assembly, it is recommended to place outlet as shown in fig 5 (90

 

rotatable). The optimal position is at 45

 when the cable outlet placed directly at the 

position of the cable support sleeve.   
- QT150HT Pipe inner diameter = ᴓ 150 mm 
- Clearance to room corners: at least 130 mm from the pipe centre  
- During the wiring the side recess for the cable entry in the housing (Fig 7, 
Position1) should be broken out.  

   

 DANGER

 

Fig 3 

Summary of Contents for QT 150HT

Page 1: ...llation and Operating Instructions QuietAir 150mm Axial Fan MODEL QT 150HT TwoSpeed Fan 220 260m3 hr With Delay Start Automatic Humidity control and Timer Low Energy Quiet Long Life Extra Safe Delay S...

Page 2: ...rotection 2 3 Start up performance Chapter 3 SPECIFICATIONS DIMENSIONS 3 0 Specifications 3 1 Product lifetime 3 2 Accessories 3 3 Dimensions Chapter 4 FUNCTION 4 0 Function description Chapter 5 CLEA...

Page 3: ...d accident prevention regulations should be observed All electrical work and commissioning should be carried out by authorized and qualified electricians Maintenance and installation work should be ca...

Page 4: ...its intended purpose The product complies with the valid regulations and CE guidelines at the time of its production 1 5 Transport The fan is factory packed so that it is protected against normal tran...

Page 5: ...a this should conform to the local supply network On the test stand fan performance complied with DIN EN ISO 5801 1 10 Noise data The noise data which relate to distances is valid under free flow cond...

Page 6: ...ff the fan switch on inhibit activates the fan for 15 sec to protect the motor from rapid on off switching CHAPTER 3 SPECIFICATIONS DIMENSIONS M1 150 F 3 0 Specifications Impeller 137 Electrical suppl...

Page 7: ...is required This feature is set at the factory to ensure a speedy dehumidification Dual stage humidity function During dual stage humidity function the fan will turn on first to the stage with a lowe...

Page 8: ...ase reduction during the fan operation The reduction however hasn t been enough to fall below the turn off threshold Short stop time activated since it can be assumed that after a short break the humi...

Page 9: ...ng Safety instructions listed in Chapter 1 2 should be observed Before cleaning always ensure that the fan is isolated from the power supply and secured against restarting Clean cover protective guard...

Page 10: ...contamination of the ventilation unit After unpacking and before installation the following points must be checked if any transport damage is noticed broken or bent parts free rotation of the impelle...

Page 11: ...draft shutter and guide vane If required backdraft shutter included in delivery can be installed behind the guide vane Fig 6 During the housing installation the guide vane should be mounted vertically...

Page 12: ...t The wiring diagram SS 1082 which can be found on Page 16 should always be used to ensure proper wire placement Check sealing of the connection cables and cable wires clamp If mounted at the inlet sp...

Page 13: ...Safety instructions listed in Chapter 1 2 must be observed To guarantee the proper function of the fan the following should be checked regularly Appearance of dust or dirt in the housing on the motor...

Page 14: ...settings stage 1 approx 70 and stage 2 approx 100 The adjustment applies to both the demand ventilation as well as for the humidity control To ensure sufficient dehumidification speed is in automatic...

Page 15: ...s humidity function the air volume is automatically controlled depending on the room humidity When the humidity increases the fan speed increases This ensures continuously increasing dehumidification...

Page 16: ...round There is humidity decrease reduction during the fan operation The reduction however hasn t been enough to fall below the turn off threshold Short stop time activated since it can be assumed that...

Page 17: ...witches 3 and 4 6 10 15 21 minutes If you switch between stages the delay timer will be ignored By simultaneous shut down of the both stages applicable delay time can be ignored As always the technica...

Page 18: ...16 12 Schematic overview for QT150 HT Fig 14...

Page 19: ...the impeller doesn t run freely note possible causes of failure in Chapter 8 1 Bearing noise Vibrations see Chapter 8 1 Power consumption according to the specifications on the type plate see Chapter...

Page 20: ...r corrosion mechanical loading fatigue and or other effects that could not be directly discerned should be disposed in accordance with local and international laws and regulations The same applies to...

Page 21: ...ble electrical supply 3 Has not been subjected to issue neglect or damage 4 Has not been modified or repaired by any person not authorised by Airflow Developments Ltd 5 Has been installed in accordanc...

Page 22: ...ement by an assessed and registered Competent Person should follow a Best Practice process and adopt air flow measurement Method A The Unconditional Method using a suitable UKAS certified measuring in...

Reviews: