![Air Techniques PERI-PRO III User Manual Download Page 4](http://html1.mh-extra.com/html/air-techniques/peri-pro-iii/peri-pro-iii_user-manual_2875562004.webp)
4
INSTALLATION
Shipping Box Contents:
Peri-Pro III Processor base with cover -
Note:
Grill Inlet Cover comes installed on
the Film Inlet Gril
l
Inside the processor:
Film transport
Chemistry tanks
(Black developer tank;
red fixer tank; white water tank
)
Accessory boxes (3) containing:
# 90850
-
3 ea. Pedo (#0) Film Carrier
2 ea. Bite-wing Film (#3) Carrier
# 90825
-
3 ea. Anterior Film (#1) Carrier
1 ea. Occlusal Film (#4) Carrier
# 90840
-
Film receptacle with 3 dividers
Unpack:
1. Place one hand on each side and under-
neath the processor. Lift the processor out of
the carton and place it on a flat surface.
Remove the end caps and plastic bag.
2. Remove the processor cover and set aside.
3. Remove the accessory boxes and retain for
future use. Remove the top packing foam.
4. Pull the cardboard insert out of the dryer rack
and set aside; lift the transport out (the trans-
port cannot be removed until the cardboard
insert is removed first).
5. Remove the shipping foam from the back
wall of the processor.
6. Remove the foam cleaning pads from the
chemistry tanks and set aside.
7. Do not remove the clips holding the water
drain tube to the perimeter of the base.
8. Set the base on a flat, level, stable counter.
Important:
The surface must be stable so that
chemistry does not splash or spill.
Locate the thermistor arm above and to the left of the developer
(black) tank. Carefully lift the arm up, using the finger hole, until it
locks in place. See Figure 3.
Note: Empty entire contents into the water tank.
Remove all three tanks and rinse.
Install the fixer tank next to the water tank, and fill with contents of
the fixer bottle. Pour carefully to prevent splashing.
Install the developer tank on the left. Fill with the contents of the
developer bottle. Lower the thermistor arm into the tank.
If chemistry or water is accidentally spilled beneath the chemistry
tanks, remove the tanks and immediately dry the tanks, both sides
of the heater plate and the depression in the base and the area
around the heater pad. Reverse the procedure to remove.
The tanks can be installed in or removed from the base only when the film transport is out
of the processor. If you installed the transport after unpacking, remove it now.
Follow the tank installation and chemistry filling sequence below to prevent contamination
of chemistry due to accidental spilling or splashing. Fixer in the developer tank will cause
contamination.
Important:
Peri-Pro chemistry should be at or below 75°F.
Install Processor
1. Fill Tanks
Figure 3.