Air Techniques PERI-PRO III User Manual Download Page 4

4

INSTALLATION

Shipping Box Contents:

 

Peri-Pro III Processor base with cover -

Note: 

Grill Inlet Cover comes installed on 
the Film Inlet Gril

l

Inside the processor:

 

Film transport

 

Chemistry tanks 

(Black developer tank; 

red fixer tank; white water tank

)

 

Accessory boxes (3) containing:
 

# 90850 

-

3 ea. Pedo (#0) Film Carrier
2 ea. Bite-wing Film (#3) Carrier

 

# 90825 

-

3 ea. Anterior Film (#1) Carrier
1 ea. Occlusal Film (#4) Carrier

 

# 90840

 -

Film receptacle with 3 dividers

Unpack: 

1. Place one hand on each side and under-

neath the processor.  Lift the processor out of 

the carton and place it on a flat surface. 

Remove the end caps and plastic bag.

2.  Remove the processor cover and set aside.

3. Remove the accessory boxes and retain for 

future use. Remove the top packing foam.

4.  Pull the cardboard insert out of the dryer rack  

and set aside; lift the transport out (the trans-

port cannot be removed until the cardboard 

insert is removed first).

5. Remove the shipping foam from the back 

wall of the processor.

6. Remove the foam cleaning pads from the 

chemistry tanks and set aside.

7. Do not remove the clips holding the water 

drain tube to the perimeter of the base.

8.  Set the base on a flat, level, stable counter.

Important:

 The surface must be stable so that 

chemistry does not splash or spill.

 

Locate the thermistor arm above and to the left of the developer 
(black) tank. Carefully lift the arm up, using the finger hole, until it 
locks in place. See Figure 3.

Note: Empty entire contents into the water tank.

 

Remove all three tanks and rinse. 

 

Install the fixer tank next to the water tank, and fill with contents of 
the fixer bottle. Pour carefully to prevent splashing.

 

Install the developer tank on the left. Fill with the contents of the 
developer bottle. Lower the  thermistor arm into the tank.

 

If chemistry or water is accidentally spilled beneath the chemistry 
tanks, remove the tanks and immediately dry the tanks, both sides 
of the heater plate and the depression in the base and the area 
around the heater pad. Reverse the procedure to remove.

The tanks can be installed in or removed from the base only when the film transport is out 

of the processor. If you installed the transport after unpacking, remove it now.
Follow the tank installation and chemistry filling sequence below to prevent contamination 

of chemistry due to accidental spilling or splashing. Fixer in the developer tank will cause 

contamination.

Important:

 Peri-Pro chemistry should be at or below 75°F.

Install Processor

1. Fill Tanks

Figure 3.

Summary of Contents for PERI-PRO III

Page 1: ...PERI PRO III INTRA ORAL FILM PROCESSOR USER S MANUAL...

Page 2: ...i Pro III uses a heating pad system to maintain uniform chemistry bath temperature ensuring the delivery of consistent film quality Additional features include q No plumbing connection required q Slim...

Page 3: ...ING ELEMENT ACCESS PANEL WASH TANK WHITE FIXER TANK RED FILM INLET GRILL FILM INLET SHUTTER COVER ASSEMBLY MAINTENANCE LABEL OPERATOR CONTROLS FILM DELIVERY RECEPTACLE AIR OUTLET GRILL AIR INLET GRILL...

Page 4: ...he base on a flat level stable counter Important The surface must be stable so that chemistry does not splash or spill Locate the thermistor arm above and to the left of the developer black tank Caref...

Page 5: ...POWER SWITCH Amber When the POWER switch is turned ON it will illuminate indicating that there is power to the proces sor and the heating system is on Turn the POWER switch OFF at the end of the day...

Page 6: ...cle when stripping covers off film The trash receptacle is especially useful when using a Daylight Loader Processing 2 Adult Films 2 films can be fed directly into the processor Duplicating films expo...

Page 7: ...at each film on the carrier is in its own groove c Remove the film inlet grill Remember to replace it when processing 2 films Insert the carrier with the film s standing vertically into the film inlet...

Page 8: ...istry level keeping the shutter and the film inlet on the top of the transport dry Use a sink or the transport wash tub that comes with the Transport Cleaning Kit PN 43975 1 Turn POWER OFF and unplug...

Page 9: ...Peri Pro III 1 Slowly and carefully lower the film transport straight into the tanks The film transport must sit squarely on the cutouts found on the top of the vertical plates to the left and right s...

Page 10: ...Maintenance If the wash tank is particularly soiled or slimy it must be thoroughly cleaned and rinsed After cleaning if the tank was removed Figure 13 Figure 14 CAUTION Use in a well ventilated area...

Page 11: ...ted Peri Pro chemistry d Use Peri Pro chemistry to assure film quality and archival quality 3 Film is cloudy or has brownish surface a Fixer is exhausted a Change chemistry after 300 350 film or 2 wee...

Page 12: ...grooves with a soft tooth brush c Timing of the transport arms is out of adjustment c Call your authorized Air Tech niques dealer for service 7 Developer is black has ammonia smell there are black de...

Page 13: ...thorized Air Techniques dealer for service f Defective drive motor f Call your authorized Air Techniques dealer for service g Films reach dryer and staythere broken gear teeth or defective gears or in...

Page 14: ...15 8 Length Width Height Overall 25 9 3 4 8 1 2 With Daylight Loader 25 9 3 4 15 3 4 With Film Duplicator Daylight Loader 25 12 3 4 15 3 4 Add 3 1 2 to length for film receptacle MINIMUM CLEARANCE TO...

Page 15: ...Cleaning Kit Formula 2000 Plus Twin Pack Contains 2 bottles of Formula 2000 Plus 2 color coded sponges 43945 Peri Pro Chemistry Case contains 3 one qt bottles Developer 3 one qt bottles Fixer 90800 Fi...

Page 16: ...nnovator and manufacturer of dental products Our priority is ensuring complete satisfaction by manufacturing reliable products and providing excellent customer and technical support Whether the need i...

Reviews: