![Air Monitor VELTRON DPT 2500 Installation, Operation And Maintenance Manual Download Page 9](http://html1.mh-extra.com/html/air-monitor/veltron-dpt-2500/veltron-dpt-2500_installation-operation-and-maintenance-manual_2875335009.webp)
VELTRON DPT 2500
Air Monitor Corporation
116-045-10.P65 (6/99)
VELTRON DPT 2500
- IO&M Manual
4
SECTION 3 – INSTALLATION
3.3 – MOUNTING
• Tools Required: Electric drill; #25 (0.1495”) bit; screwdriver or nutdriver; and four #8-32 self-tapping machine screws.
• The VELTRON DPT 2500 can be mounted in any position provided it is secured using all four mounting holes.
• Reasonable consideration should be given to clearances for pressure and electrical connections.
• Once a suitable location is found, use the unit as a template to mark the centers of the four mounting holes.
• Drill four pilot holes at the marked locations. With the unit in position, install the four #8-32 screws.