SECTION 3 – INSTALLATION
3.5 – POWER/SIGNAL CONNECTIONS
All wiring is done at the terminal strip of the VELTRON DPT 2500. The cover needs to be opened or removed to gain access to the
terminal strip. On the industrial version, the signal/power wires need to be routed through the conduit connection on the bottom
side of the enclosure. It is recommended that wiring be between 14 awg and 22 awg, and no more than two wires should be
connected to any one terminal. Follow Figure 2 below to connect the Power/Signal wires.
Figure 2
The maximum load resistance that can be driven will depend on the power supply voltage (see Figure 3 below).