4. Installation Procedures
air
avionics
4.3 Interconnect Installation
In appendix C, wiring diagrams for most common installation cases are given.
Install all electrical connectors and ensure that they are appropriately secured. We
recommend using ‘‘Quicklock’’ D-Sub backshells (standard configuration).
4.4 Post Installation Configuration, Checkout, and Documentation
This is a summary of the steps required for checkout, configuration, and installation
documentation:
•
Perform the installation checks. Instructions can be found in chapter 5.
•
Configure the unit for the specific installation. Work though every configuration item
according to instructions in chapter 6.
•
Perform ground checks. Instructions can be found in chapter 7.
•
Update the aircraft documentation. Instructions can be found in chapter 8.
20
ATD
·
Installation Manual
·
rev. 3.0
·
2019/05/09