INSTALLING THE DATA AND I/O CABLE TO THE UEC
BILL OF MATERIALS
PART NUMBER
QTY DESCRIPTION
UEC-4800
0
Torque Controller
UEC-4800EPL-UPGRAD
1
Kit
1. Connect the UEC null modem cable to the DB9 PC plug on the back of the UEC.
2. Connect the I/0 cable to the I/O terminal block top row on the back of the UEC, black wire to COM (upper)/IN COM, red wire to LS1/IN6,
white wire to RESET/IN3, green wire to work A/IN4 and yellow wire to work B/IN5
3. Connect the red fork with the two blue wires to the lower COM and the other red fork and the black wire to the top COM. Install male bullet
(26376) into the bullet connector on the blue wire. Bundle wires, zip tie, and reinstall the I/O cover.
WEAR ESD GROUND STRAP WHEN HANDLING PCB
1
2
I/O CABLE
3
FORK CONNECTOR
BULLET CONNECTOR
3
3
BULLET CONNECTOR
NULL MODEM CABLE
Summary of Contents for UEC-4800EPL
Page 1: ...UEC 4800EPL Upgrade Kit INSTRUCTION MANUAL ...
Page 2: ......