I N S T A L L A T I O N S E Q U E N C E
1 0
4
Installation Sequence
1.
Make sure that the voltage is not on!
2.
Make sure that the meter type is correct for the installation site
(type V or J).
3.
Remove the terminal block cover.
4.
Make the required wiring. The connection diagram is located
inside the terminal block cover. The connections for the option
cards are also presented there.
5.
Attach the cover. Seal the device, if necessary.
6.
You can install an auxiliary name plate to the place reserved for
it under the sliding cover. See Figure 1. The use of stick-on
label is recommended. You can use the E700UI software to
print the auxiliary name plates. For information on how to open
the cover, refer to chapter 2.3 Reserve battery.
7.
Switch on the voltage.
8.
Check that the meter has the correct date and time. If necessary,
update them using the push buttons or the E700UI software.
©