
Montageanleitung TST40/45 Trockenbau - Doppelbeplankung
Istruzioni d'assemblaggio TST40/45 per strutture a secco – doppia lastra
Assembly instruction TST40/45 for dry construction – double layer
Manuel d'assemblage TST40/45 pour cloison sèche – double plaque de plâtre
Page 10 of 11
Ständerbau/Costruzione a secco/Timber
construction/Support en bois
Befestigungsbügel/Staffe di fissaggio/Wall
fixing brackets/Étrier de fixation
Putznetz/Rete d'armatura/Mesh/Enduit
2. Beplankung/Seconda lastra/2
nd
planking/2ème plaque de plâtre
Verspachtelung/Stuccatura/Skim
coating/Enduit
Detail/Détail/
Dettaglio I
Detail/Détail/Dettaglio K
1. Beplankung/Prima lastra/1
st
planking/1ère
plaque de plâtre
AGS-systems GmbH/srl • I-39025 Naturns/Naturno BZ • Staben/Stava 47B • Tel./Ph. +39 0473 666376 • Fax +39 0473 420390
St.Nr. MwSt./Cod.Fisc P.IVA/VAT No. IT02509250219 • [email protected] • www. ags-systems.com