12
MAINTENANCE INSTRUCTIONS
All the information concerning both the maintenance operations and their maturity dates are indicated in the “A”
form. Failure to respect the deadlines might affect the proper functioning of the machine and may invalidate any
warranty.
“A” FORM AND SCHEDULED MAINTENANCE
FIRST
RUN
AFTER
10 H.
EACH
30 H.
AFTER
50H.
EACH
250 H.
END OF
THE
SEASON
WORK
START
WORK
END
MACHINE
Greasing
Greasing
Cleaning
Greasing
Cleaning
TANK
Oil level
Oil level
Oil level
Oil change
OIL FILTER
Replacing Replacing
SCREWS
Tightnening Tightnening
Tightnening
KNIVES AND
BLADES
Damage
checking
Checking
Checking
Checking
COUNTER-
KNIFE
Damage
checking
Checking
Checking
Checking
BELT
Tension
checking
Replacing
NOTE :
During the first hour operation the driving belts lenghten and set.
After the first start, it will be necessary to check the driving belts ' tension in order to prevent the driving belts
from early damage. In order to do so read the instructions at page 17, paragraph 6.
Before taking any maintenance measures, switch the engine off, disconnect the PTO and make sure that the
rotor is completely still.
Summary of Contents for ARIETE
Page 21: ...21 SPARE PARTS LIST ...
Page 22: ...22 MECHANISMS ...
Page 23: ...23 MACHINE STRUCTURE ...
Page 24: ...24 HOPPER EXHAUST TUBE THIRD POINT ...
Page 25: ...25 NO STRESS HYDRAULIC SYSTEM ...
Page 27: ...27 ...