Operation
4-16
PROCESS CONTROL CHART
Process:
Product:
Material Top:
Material Bottom:
Other Material:
Date Settings Documented:
Front Control Settings
Speed (Ft/min):
Direction: Forward Reverse
Nip Roll: Up Down
Shim Dial Setting:
Roll Pressure: (PSI)
Top Temp. Setting: Deg. F
Top Roll Heater: On Off
Bottom Temp. Setting: Deg. F
Bottom Roll Heater On Off
Rear Control Settings
Pull Roll: Up Down
Pull Roll Pressure:(PSI)
Shim Dial Setting:
Film Station Settings
Upper Rear Station:
Lower Front Station:
Other Instructions:
Summary of Contents for Encore Maxim
Page 23: ...Operation 4 17...
Page 28: ......
Page 30: ......
Page 33: ......
Page 36: ......
Page 39: ......
Page 42: ......
Page 45: ......
Page 47: ......
Page 49: ......
Page 52: ......
Page 55: ......
Page 57: ......
Page 59: ......
Page 60: ......
Page 65: ......
Page 67: ......
Page 69: ......
Page 72: ......