![AGL Encore Maxim Operator'S Manual Download Page 18](http://html1.mh-extra.com/html/agl/encore-maxim/encore-maxim_operators-manual_2868940018.webp)
Operation
4-12
Pressure Sensitve Process (Reverse)
Sometimes mounting processes are required to be run between encapsulation processes. Since the nip
rolls will be very warm due to the encapsulation process it is not possible to run a cold mounting process
without letting the roll cool down. This could be a very long wait depending on the temperatures used for
the encapsulation process. It is possible to run a single side mounting process through the pull rolls in
reverse. The web diagram for this process is shown below:
Figure 9. Pressure Sensitive Process (Reverse)
Web Diagram
Summary of Contents for Encore Maxim
Page 23: ...Operation 4 17...
Page 28: ......
Page 30: ......
Page 33: ......
Page 36: ......
Page 39: ......
Page 42: ......
Page 45: ......
Page 47: ......
Page 49: ......
Page 52: ......
Page 55: ......
Page 57: ......
Page 59: ......
Page 60: ......
Page 65: ......
Page 67: ......
Page 69: ......
Page 72: ......