Installing a Flame Ionization Detector on an Agilent 6850 Gas Chromatograph
7
4.
Loosen the signal board clamp.
5.
Unplug the signal board from the A/D converter board.
6.
Disconnect the wiring from the signal board.
FID
– Disconnect the ribbon cable. Unplug the ignitor cable. Pass both
cables through the hole to the top side of the lid.
The ribbon cable connector will not pass through the rubber grommet in
the hole. Use a small screwdriver to push the grommet to the top of the
lid; the cables will now fit through the hole.
Ribbon cable
Signal board
(FID shown)
Signal board clamp
A/D converter board
Summary of Contents for G2621-64000
Page 1: ...Installation Guide Flame Ionization Detector on a 6850 GC Accessory G2621 ...
Page 16: ...14 ...
Page 17: ......