Eyesys Mini-B/A Gauge Controller
5
Figure 2
Removal and Placement of Top Half Case Assembly
3. Remove 3x socket head cap screws and lockwashers as shown in Figure 3, and save for
re-use.
Figure 3
Removal of Socket Head Cap Screws and Lockwashers
Bottom Case Half Assembly
Top Case Half Assembly
Gauge Tube Assembly
Insular Disk
Plain Washer
(this hole only)
3x
tube and save)
(remove from
Small PCB
Bottom Case Half
Summary of Contents for Eyesys Mini-B/A
Page 12: ...Eyesys Mini B A Gauge Controller This page intentionally left blank ...
Page 14: ...Eyesys Mini B A Gauge Controller This page intentionally left blank ...
Page 28: ...Eyesys Mini B A Gauge Controller 14 Table 8 Gas Correction Factors ...
Page 29: ...Eyesys Mini B A Gauge Controller 15 Table 7 Gas Correction Factors continued ...
Page 30: ...Eyesys Mini B A Gauge Controller This page intentionally left blank ...
Page 39: ...Returned Materials Report ...
Page 40: ......
Page 41: ......